  • Notice Summary
    UK-London: HS2 C1 - South Portal Construction Slab and associated Concrete Structures (SHORT DEADLINE)
    GB003ZM303682
    ALIGN JV (Bouygues Travaux Publics, VolkerFitzpatrick and Sir Robert McAlpine)
    24 July 2019
    30 July 2019
    Contract Notice - Other
  • Notice Abstract

    Formwork, reinforcement and concreting works associated with the construction of the South Portal Base Slab, Shifting Ways, Cradle Slabs, Launching seals and Tympanum. Package to include the provision of all materials (NB – concrete to either be free-issue or purchased from our preferred supplier, from our site batching plants to be erected in Spring 2020 - TBC), labour, plant ancillary products, consumables, etc. needed to undertake the works. Formwork shall be designed by the appointed sub-contractor. All works are required to facilitate the launch of the Tunnel Boring Machines in the first instance, however the installations are also to be incorporated into the permanent works after tunnelling works have been completed. NB – Launching Seal will be provided free-issue, with the appointed sub-contractor responsible for site assembly, fixing, alignment and assembly

  • Notice Details

    CONTRACT NOTICE – NATIONAL

    WORKS

    1 Authority Details

    1.1

    Authority Name and Address


    ALIGN JV (Bouygues Travaux Publics, VolkerFitzpatrick and Sir Robert McAlpine)

    N/A

    London


    UK

    N/A

    N/A


    N/A

    1.2

    Address from which documentation may be obtained

    As in 1.1

    1.3

    Completed documents must be returned to:

    As in 1.1

    2 Contract Details

    2.1

    Title

    HS2 C1 - South Portal Construction Slab and associated Concrete Structures (SHORT DEADLINE)

    2.2

    Description of the goods or services required

    Formwork, reinforcement and concreting works associated with the construction of the South Portal Base Slab, Shifting Ways, Cradle Slabs, Launching seals and Tympanum. Package to include the provision of all materials (NB – concrete to either be free-issue or purchased from our preferred supplier, from our site batching plants to be erected in Spring 2020 - TBC), labour, plant ancillary products, consumables, etc. needed to undertake the works. Formwork shall be designed by the appointed sub-contractor. All works are required to facilitate the launch of the Tunnel Boring Machines in the first instance, however the installations are also to be incorporated into the permanent works after tunnelling works have been completed.

    NB – Launching Seal will be provided free-issue, with the appointed sub-contractor responsible for site assembly, fixing, alignment and assembly

    2.3

    Notice Coding and Classification

    2.4

    Total quantity or scope of tender

    Delivery point C1 Section- South Portal

    Estimated contract start date 01/07/2020

    3 Conditions for Participation

    3.1

    Minimum standards and qualification required

    4 Administrative Information

    4.1

    Type of Procedure

    The procedure type is unknown.

    4.2

    Reference number attributed to the notice by the contracting authority

    n/a

    4.3

    Time Limits

       30-07-2019  Time 18:00

    4.5

    Language or languages in which tenders or requests to participate can be drawn up

    EN 

    4.6

    Tender Submission Postbox

    5 Other Information

    5.1

    Additional Information

    Please register as a supplier on the following portal to view this notice:

    https://www.competefor.com

    CompeteFor response deadline 30/07/2019 at 18:00 hrs

    (MT Ref:303682)

    5.2

    Additional Documentation

    5.3

    Publication date of this notice

     24-07-2019