Title:
UK-London: Works for the Institute of Education, Masterplan – Phase 2
Document Ref:
GB003ZM302688
Document Type:
Contract Notice - Other
Published By:
University College London
Date Published:
16 July 2019
Deadline Date:
12 August 2019
Document Source:
Framework/DPS:
No
Alert Profile:
Labels:

Notice Abstract

The Institute of Education (IOE) building of 20 Bedford Way is extremely tired, and an agreement at merger with UCL was for investment into the building to ensure it is fit for work and study, and an appropriate space to reflect the world-leading status of the IOE faculty and of UCL. The state of the building has lent an additional urgency to this work, to ensure health and safety standards and staff and student wellbeing. The IOE Masterplan sets out, in multiple phases, a clear strategy for improving the quality of the existing accommodation at 20 Bedford Way and rectifying the inherent safety and infrastructure problems with the building. Phase 1 of the Masterplan was completed in May 2019, this tender relates to Phase 2 of the Masterplan and will deliver the following: • Refurbishment of an additional 25% of the building (cumulative being 35% when added to the 10% within phase 1) • Remediation of asbestos in the proposed works areas. • 100% replacement of the existing fire alarm system with new and holding works to retained life safety systems until phase 3. • 100% replacement of the infrastructure in Cores A and B and the accommodation being refurbished in and around Core A and the Wing. • An additional 1,871sqm of refurbished, high-quality workspace, with 223sqm meeting space. • Refurbished lift cores with new sanitary facilities to all levels providing an additional 173sqm toilets / 14% increase. • Refurbished Lawton Room for staff and students with a dedicated staff social area. • Improved security and wayfinding to new staff areas. • Refurbished and improved Entrance Area to the building across levels 3 & 4 • Refurbished workspaces will create a comfortable working environment, with improved air quality, temperature control, good acoustics and noise separation from the external environment.

Notice Details

CONTRACT NOTICE – NATIONAL

WORKS

1 Authority Details

1.1

Authority Name and Address

University College London
N/A
London UK
N/A N/A
N/A

1.2

Address from which documentation may be obtained

As in 1.1

1.3

Completed documents must be returned to:

As in 1.1

2 Contract Details

2.1

Title

Works for the Institute of Education, Masterplan – Phase 2

2.2

Description of the goods or services required

The Institute of Education (IOE) building of 20 Bedford Way is extremely tired, and an agreement at merger with UCL was for investment into the building to ensure it is fit for work and study, and an appropriate space to reflect the world-leading status of the IOE faculty and of UCL. The state of the building has lent an additional urgency to this work, to ensure health and safety standards and staff and student wellbeing.

The IOE Masterplan sets out, in multiple phases, a clear strategy for improving the quality of the existing accommodation at 20 Bedford Way and rectifying the inherent safety and infrastructure problems with the building. Phase 1 of the Masterplan was completed in May 2019, this tender relates to Phase 2 of the Masterplan and will deliver the following:

• Refurbishment of an additional 25% of the building (cumulative being 35% when added to the 10% within phase 1)

• Remediation of asbestos in the proposed works areas.

• 100% replacement of the existing fire alarm system with new and holding works to retained life safety systems until phase 3.

• 100% replacement of the infrastructure in Cores A and B and the accommodation being refurbished in and around Core A and the Wing.

• An additional 1,871sqm of refurbished, high-quality workspace, with 223sqm meeting space.

• Refurbished lift cores with new sanitary facilities to all levels providing an additional 173sqm toilets / 14% increase.

• Refurbished Lawton Room for staff and students with a dedicated staff social area.

• Improved security and wayfinding to new staff areas.

• Refurbished and improved Entrance Area to the building across levels 3 & 4

• Refurbished workspaces will create a comfortable working environment, with improved air quality, temperature control, good acoustics and noise separation from the external environment.

2.3

Notice Coding and Classification

2.4

Total quantity or scope of tender

3 Conditions for Participation

3.1

Minimum standards and qualification required

4 Administrative Information

4.1

Type of Procedure

The procedure type is unknown.

4.2

Reference number attributed to the notice by the contracting authority

UCL-PROC-000957-S

4.3

Time Limits

   12-08-2019  Time 12:00

4.5

Language or languages in which tenders or requests to participate can be drawn up

EN 

4.6

Tender Submission Postbox

5 Other Information

5.1

Additional Information

Please visit the following portal to view this notice:

https://in-tendhost.co.uk/ucl/aspx/ProjectManage/1004

Date documents can be requested until: 12 Aug 2019

(MT Ref:302688)

5.2

Additional Documentation

5.3

Publication date of this notice

 16-07-2019